Projects

Projects associated with this ULB
Project Name

MSW Raw Waste Treatment Plant

Amount
₹85,71,817.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

RO Plant

Amount
₹51,88,107.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

HOT And Cold Drinking waters facility (4 Nos.)

Amount
₹36,64,096.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Gandhi Path Link Path (Near Madhab Saikia, Ward No.-02) under 14th FC for the year 2015-16. (1st installment)

Amount
₹1,10,840.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Puberun Path Ward No.-01 under 14th FC for the year 2015-16. (1st installment)

Amount
₹1,00,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Pubali Path (Jyotinagar, Ward No.-01) under 14th FC for the year 2015-16. (1st installment)*

Amount
₹1,21,844.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement on Titka village Road (Back side of Titka HS School) Ward No.-08 under 14th FC for the year 2015-16. (1st installment, General Basic Grant)

Amount
₹13,41,598.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Cover Storm water Drain along the Siba Dhan Path*

Amount
₹29,92,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹4,99,061.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹4,84,030.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)*

Amount
₹4,74,909.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Supply of snadgravel and SWM related works for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹20,00,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Puberun Path Ward No.-01 under 14th FC for the year 2015-16. (1st installment)

Amount
₹1,00,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement on Titka village Road (Back side of Titka HS School) Ward No.-08 under 14th FC for the year 2015-16. (1st installment, General Basic Grant)

Amount
₹13,41,598.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement on Rayatpara Road, Ward No.-06 Ward No.-08 under 14th FC for the year 2015-16.(1st installment, General Basic Grant)

Amount
₹12,12,576.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Kanak Talukdar Path Ward No.-03 under 14th FC for the year 2015-2016. (1st installment)

Amount
₹2,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Construction of RCC Cover Storm water Drain along the Siba Dhan Path*

Amount
₹29,92,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹4,99,061.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹4,84,030.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Renovation of Fish Market at Pathsala Daily Bazar under 14th FC (North side and South side Shed) for the year 2017- 18 during the year 2019- 2020. (2nd Installment, General Basic Grant)*

Amount
₹4,74,909.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Supply of snadgravel and SWM related works for the year 2017-18 during the year 2019-2020. (2nd Installment, General Basic Grant)

Amount
₹20,00,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP at Lachit Path ward no – 01

Amount
₹14,20,545.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of Islampur Road at Lachit Path ward no – 04

Amount
₹7,92,829.00
Ward Name
4
Physical Progress
0
Financial Progress
0
Project Name

Improvement of Anandi Saloi Path, Ward No.-02 under 14th FC for the year 2018- 2019 during the year 2020- 2021.

Amount
₹3,30,764.00
Ward Name
2
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Lakhimi Path, Ward No.-02 under 14th FC for the year 2018-19 during the year 2020-2021. (2nd Installment)

Amount
₹2,93,321.00
Ward Name
2
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Rayatpara Road (From Milanpur Road to Pathsala Kenduguri PWD Road), Ward No.-08 under 14th FC for the year 2018- 19during the year 2020-21. (2nd Installment, Ch. 0.00m to Ch. 175.00m)

Amount
₹11,12,458.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Rayatpara Road (From Milanpur Road to Pathsala Kenduguri PWD Road), Ward No.-08 under 14th FC for the year 2018-19 during the year 2020-21. (2nd Installment, Ch. 175.00m to Ch. 350.00m)

Amount
₹11,12,457.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Ananta Dham Path, Ward No.-08 under 14th FC for the year 2018-19 during the year 2020-21.(2nd Installment, Ch. 0.00m to Ch. 183.00m)

Amount
₹13,61,666.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Ananta Dham Path, Ward No.-08 under14th FC for the year 2018-19 during the year2020- 21. (2nd Installment, Ch. 183.00m to Ch. 366.00m)

Amount
₹13,61,666.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Ananta Dham Path, Ward No.-08 under 14th FC for the year 2018-19 during the year 2020-21. (2nd Installment, Ch. 366.00mto Ch. 550.00m)

Amount
₹13,61,668.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Improvement of Rayatpara Road (From Milanpur Road to Pathsala Kenduguri PWD Road) under 14th FC for the year 2017-18 during the year 2019-20. (1st Installment, General Basic Grant; From Ch. 0.00m to 175.00m)

Amount
₹3,10,460.00
Ward Name
6
Physical Progress
0
Financial Progress
0
Project Name

Improvement of Rayatpara Road (From Milanpur Road to Pathsala Kenduguri PWD Road) under 14th FC for the year 2017-18 during the year 2019-20. (1st Installment, General Basic Grant; From Ch. 176.00m to 350.00m)

Amount
₹3,10,460.00
Ward Name
6
Physical Progress
0
Financial Progress
0
Project Name

Purchase of Tractor with trailor

Amount
₹8,81,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Repairing of Puberun Path ward no -01

Amount
₹1,52,200.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Repairing of Kanaklata Path Ward NO -1

Amount
₹1,22,300.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Repairing of Gandhi Path Link Path Ward NO-02

Amount
₹6,98,178.00
Ward Name
2
Physical Progress
0
Financial Progress
0
Project Name

Repairing of Kanak Talukdar Path Ward no – 03

Amount
₹64,700.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Repairing of road from NH- 31 to Namghar

Amount
₹71,600.00
Ward Name
6
Physical Progress
0
Financial Progress
0
Project Name

Repairing of howly road to Kriti mohan house Ward no – 03

Amount
₹1,37,944.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Repairing of Kanak Kakati house to Ghanasham Kakati House W NO-05

Amount
₹1,88,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
Project Name

Earthfilling and sand gravelling at Bhupen Hazarika House W NO – 06

Amount
₹2,53,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
Project Name

Repairing of road from Jinaram House to Phukan Das house W No – 08

Amount
₹59,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Repairing of road from Mrinal sarma House to Madan Sarma Plot

Amount
₹1,37,944.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Repairing of road from Homeswar Patuwari house to Dipak Das w no - 09

Amount
₹1,41,500.00
Ward Name
9
Physical Progress
0
Financial Progress
0
Project Name

Construction of 1CBP of Bye lanc of Gandhi Path (Jyotinagar, from Gandhi Path to Dwipen Roy house), Ward No.-01 under 14" FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹5,83,460.00
Ward Name
1
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Puberun Path (Jyotinagar), Ward No,-01 under 14h FC Grant for the year 2019-20 during the ycar 2022-23.

Amount
₹10,00,033.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Sankardev Path (Lachit Nagar), Ward No.-01 under 14 FC Grant for the ycar 2019-20 during tthe year 2022-23.

Amount
₹10,91,266.00
Ward Name
1
Physical Progress
100
Financial Progress
100
Project Name

Construction of 1CBP of Arunoday Path (Jyotinagar), Ward No.-01 under 14h FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,30,542.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of 1CBP of Station Path Bye Lane (Near Niranjan Sarma house), Ward No.-02 under 14h FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹8,36,73,100.00
Ward Name
2
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Bye lane of Gandhi Path, Rupnagar (Hemanta Roy to Mahendra Pathak), Ward No.-02 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹3,16,313.00
Ward Name
2
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Bye lane of Sibadham Path, ( Near Suren Deka house), Ward No.-03 under 14h FC Grant for the year 2019-20 during the year 2022-23

Amount
₹9,21,187.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Surath Roy Path (In front of Sailen Basumatary house), Ward No.-03 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹13,81,083.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Kanak Talukdar Path, Ward No. -03 under 14 FC Grant for the year 2019- 20 during the year 2022-23.

Amount
₹7,86,908.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Lakhimi Path (Milanpur), Ward No.-4 under 14h FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,23,727.00
Ward Name
4
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Pragati Nagar Path, Ward No.-4 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,39,842.00
Ward Name
4
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Sambhu Nath Path, Ward No.-5 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,03,700.00
Ward Name
5
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Muguria Village Nath Path (In front of Nitu Kakati house), Ward No.-5 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹3,55,601.00
Ward Name
5
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Udayanpur Path (Bye lane No.-1), Ward No. 06 under 14h FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,32,696.00
Ward Name
6
Physical Progress
100
Financial Progress
100
Project Name

Improvement of Road by earth filling (From Tiken das to New colony Namghar), Ward No.-07 under 14" FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹3,00,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Titka Village Road (From PWD Road to Nagen Talukdar house), Ward No.-08 under 14" FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹9,99,643.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP of Jonaki Path (Chandra Nagar), Ward No.-09 under 14" FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,21,393.00
Ward Name
9
Physical Progress
100
Financial Progress
100
Project Name

Construction of ICBP of Baruapara Road (Near Sat Sangha), Ward No. 10 under 14 FC Grant for the year 2019-20 during the year 2022-23.

Amount
₹10,19,795.00
Ward Name
10
Physical Progress
100
Financial Progress
100
Project Name

Imp of Gandhi Path (Rup Nagar ward -2

Amount
₹32,77,630.00
Ward Name
2
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road from NH31 to Topoban Ward No – 06

Amount
₹12,67,343.00
Ward Name
6
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road Bisnupurpath Ward No – 03

Amount
₹12,59,623.00
Ward Name
3
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road from college Path to Madan Pathak House Ward No – 01

Amount
₹5,70,684.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road at seuj Nagar path No – 01

Amount
₹11,74,211.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road from NH-127A to Kishor Sarma House Ward No -5

Amount
₹6,27,810.00
Ward Name
5
Physical Progress
0
Financial Progress
0
Project Name

Construction of ICBP road from Jinaram Road to Mukul Dutta House Ward No -8

Amount
₹16,74,203.00
Ward Name
8
Physical Progress
0
Financial Progress
0
Project Name

Covid

Amount
₹3,60,126.00
Ward Name
1
Physical Progress
0
Financial Progress
0
Project Name

Electrification at SWM Plant

Amount
₹1,46,138.00
Ward Name
9
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Amount
₹0.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Panchanan Path (Lachit Nagar) at Pathsala, Ward No.-01 under 15 FC for the year 2020-21. (1s Installment)

Amount
₹8,15,950.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Indravanu (Krishna Nagar) Path at Pathsala, Ward No.-01 under 15th FC for the year |2020-21.(|" Installment).

Amount
₹5,23,133.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (1CBP) Road ofBye-lane of Old NT Road (East side of Bajali HS School Play Ground) at Pathsala, Ward No.-01 under I 5th FC for the year 2020-21 (1" Install1ment).

Amount
₹7,32,025.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Biock Pavement (ICBP) Road from Satish Talukdar to Hemkanta Talukdar at Pathsala, Ward N0.-0I under 15h FC for the year |2020-2| (1 Installment).

Amount
₹11,32,942.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) Road of Gandhi Path Link Path (Rupnagar. from Main Gandhi Path to Railway Station) at Pathsala, Ward No.-02 under !FC for the yeä: 2020-21 (1" Installment).

Amount
₹13,93,762.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (1CBP) Road of Santipur Link Path (From Hiteswar Talukdar house to NH-3 ) at Pathsala. Ward No.-03 under 1Sth FC for the year 2020-21 (1 Installment).

Amount
₹7,16,024.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of lnterlocking Concrete Block Pavement (1CBP) Road of Ramesh Nagar Path at Pathsala. Ward No.-03 under I Sth FC for the year 2020-21 (1Installment).

Amount
₹8,12,456.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block |Pavement (1CBP) Road of Howly Road Link Path (In front of Irrigation Oftice, from Ranjit Kalita house to Badan Nath house) at Pathsala, Ward No.-03 under 1 Sth FC for the year 2020-21 (1st Install1ment).

Amount
₹7,37,278.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (1CBP) Road of Lakhimi Path at Pathsala, Ward No. -04 under 1 5th FC for the year 2020-21 (Ist Installment).

Amount
₹9,48,435.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (1CBP) Road of Surendra Nath Sama at Pathsala, Ward No,-05 under ISth FC for the year 020-21 (1st Installmen).

Amount
₹7,17,044.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (JCBP) Road of Pathsala College Approach Road at Pathsala. Ward No.-06 under 15th FC tor the year 2020-2 I (Ist Installment).

Amount
₹6,92,428.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Interlocking Concrete Block Pavement (ICBP) R0ad of Milanpur Link Path (From Milanpur Path to Kandarpa Sarna house) at Pathsala, Ward No.-06 under I Sth FC for the year 2020-21 (1st Installment).

Amount
₹8,88,439.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Kanak Talukdar Path Ward No.-03 under 14th FC for the year 2015-2016. (1st installment)

Amount
₹2,00,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Prayag Nagar Path, Ward No.-06 15 FC untied 2020-21 (1st installment)

Amount
₹9,82,612.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Udayanpur Path, (Bye Lane No.-03), Ward No.-06 15 FC untied 2020-21 (1st installment)

Amount
₹16,21,037.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Kanak Talukdar Path, Ward No.-03 Ward No.-06 15 FC untied 2020-21 (1st installment)

Amount
₹18,07,708.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Howly Road Link Path (Near PWD Office, from Howly Road to Kularanjan Das), Ward No.-03 15 Fc Untied 2020-21 (1St Installment)

Amount
₹10,49,513.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Howly Road Link Path (Near ASEB Office, from Howly Road to Sibadham Path), Ward No.-03 15 Fc Untied 2020-21 (1St Installment)

Amount
₹12,13,037.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Howly Road Link Path (From Howly Road to 316/2) No. Pathsala Balika LP School, Ward No.-03 15 Fc Untied 2020-21 (1st Installment)

Amount
₹7,26,351.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling near Dolo Gohai Than 15 Fc Untied 2020-21 (1St Installment) 15 Fc Untied 2020-21 (1st Installment)

Amount
₹1,89,826.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constructi on of ICBP Road of At Pathsala Daily Bazar, Ward No. 03, under 15 FC (2nd Instalment) for the year 2020- 21 during the year 2021-22.

Amount
₹7,63,482.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Repairing of SPT Wooden Bridge on Bishan nala Jan (Path sala, Ward No 01) u nder 15 FC (2nd Instalment) for the year 2020- 21 during the year 2021-22.

Amount
₹3,50,524.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of 1CBP Ro ad (Byc Lane of Gandhi Path, to Himangshu Roy Hou se) Ward No. 02 under 15 FC (2nd Instaiment ) for the year 2020-21 during the year 2021-22

Amount
₹4,19,906.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of ICBP Road of Swahid Sarifud din Ali Path, Pat hsala, Ward No 04 under 15 FC (2nd Instalment) for the year 2020- 21 during the year 2021-22.

Amount
₹9,88,830.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Office Building (1" Floor) at Pathsala MB under 15th FC (2nd Installment) for the year 2020-2021 during the year 2021-2022. (Brick work with both side plaster, Floor tiles, Colouring Wooden door, Aluminium window and vantilation, Grill fittings, Internal elctrification and Water supply & Sanitary works, Steel Ralling etc.)

Amount
₹8,20,489.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC Cover Slab on existing RCC Storm Water Drain (Ward No.-03 & 09) under 15th FC (2nd Installment) for the year 2020-2021 during the year 202 1-2022.

Amount
₹12,07,587.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Roads (Santipur, Rayatpara Roads & Kanaklata Path) under 15th FC for the year 2020-21 during the year 2021-22 (2nd Irstallment)

Amount
₹10,73,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Protetion work at Ananta Dham (Creamation Ground) Pathsala Ward No.- 8 under 15th FC for the year 2020-21 during the year 2021-22 (2nd Installment)

Amount
₹10,00,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Corstruction of Irterlocking Concret Block Pavement (ICBP) roads of (frorm NH 127(A) to Uttar Bajali High School) under 15th FC for the year 2020-21 during the year 2021-22 (2nd Installment)

Amount
₹5,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Office Bbuilding 1st Floor at Pathsala Municipal Board under 15th Fc for the year 2020-21 during the year 2021-22 (2nd Irsta llrnent)

Amount
₹24,92,300.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Corstruction of Seujpur Path (Bye Lane) Ward No.- 1 under 15 th FC |(Untied Basic Grant) for the year 2020-21 duDing the year 202 1-22 (2nd Instalment)

Amount
₹66,95,700.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction ofICBP Road of Puberun Path, Ward No.-01 under 15th FC Untied Grant (1 Inst), for the year 2023-24 during the year 2024-25.

Amount
₹3,69,519.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction ofICBP Road of Kanak Talukdar Path, Ward No.-03 under 15th FC Untied Grant (1# Inst), for the year 2023-24 during the year 2024-25.

Amount
₹2,03,449.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of ICBP Road of Surath Roy Path, Ward No.-03 under 15th FC Untied Grant (1s Inst), for the year 2023-24 during the year 2024-25.

Amount
₹2,96,578.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of ICBP Road of Station Path, Byelane (Near Niranjan Sarma house) Ward No.-02 under 15th FCUntied Grant (1% Inst), for the year 2023-24 during the year 2024-25.

Amount
₹2,12,824.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of ICBP Road of Sambhu Nath Path, Ward No.-05 under 1st FC Untied Grant (|" Inst), for the year 2023-24 during the year 2024-25.

Amount
₹3,69,313.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of ICBP Road of Baruapara Road (Near Sat Sangha), Ward No.-10 under 15th FC Untied Grant (1" Inst), for the year 2023-24 during the year 2024-25

Amount
₹2,38,626.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of New Office Building (LICI) under 15th FC (2nd Installment of Untied Basic Grant) for 2021-22 during the year 2022-23

Amount
₹99,80,873.00
Ward Name
1
Physical Progress
50
Financial Progress
21
View on Google Map